Project description MICROSOFT PROJECTS

Microsoft development, database development and database administration, web portals and OO development...

Small railway interlocking - Sybase, SQL, Delphi, ADA

SIEMENS

Sybase, SQL, Delphi 3.0, 4.0, 5.0, ADA

Siemens AG, Wallisellen

PROJECT LINK: Not available
People in the PROJECT: Stefan Troehler
PROJECT Duration: May 1999 - May 2001
PROJECT Value: SFR. 240'000.00

MICROSOFT

Project portfolio
0
HOURS REQUIRED
0
CUP OF COFFEE
0
LINES IN THE CODE
0
EXPERTS IN THE PROJECT

Developing an application for the design and control of a small train signal box. Task: Developing the component management, submitting all reports regarding existing components in order to be able to design the interlocking. This area of ​​the application was developed using Sybase as the backend and Delphi as the frontend.

  • Creating an application (Sybase, TSQL and Delphi 3.0 / 4.0 / 5.0) for the system data.
  • Administration of the railway signal box.
  • With the help of this application, the individual components of the SIMIS railway signal box can be configured and managed.
  • We are talking about components such as "switches" from which the railway signal box is subsequently built.
  • These components are always standardized products.
  • The international team of 22 developers realized the following products.
  • The application for the system data administration for the railway signal box.
  • User interface development using Delphi 3.0 / 4.0 / 5.0.
  • Database Sybase, database logic implemented using stored procedures.
  • The interlocking was implemented using Ada, graphic tools using C ++.
  • The ODBC interface was also implemented using C ++.
  • SIHL-LEVEL 4 development.
  • Testing and documentation (user and technical).